Open Access
Issue
RAIRO-Oper. Res.
Volume 57, Number 3, May-June 2023
Page(s) 1267 - 1284
DOI https://doi.org/10.1051/ro/2023045
Published online 14 June 2023
  • J.N. Gupta and S.K. Gupta, Single facility scheduling with nonlinear processing times. Comput. Ind. Eng. 14 (1988) 387–393. [CrossRef] [Google Scholar]
  • M. Ji, X. Tang, X. Zhang and T.E. Cheng, Machine scheduling with deteriorating jobs and DeJong’s learning effect. Comput. Ind. Eng. 91 (2016) 42–47. [Google Scholar]
  • Y. Gao, J. Yuan, C.T. Ng and T.C.E. Cheng, A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. Eur. J. Oper. Res. 273 (2019) 74–81. [CrossRef] [Google Scholar]
  • L. Tang, X. Zhao, J. Liu and J.Y.T. Leung, Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine. Eur. J. Oper. Res. 263 (2017) 401–411. [CrossRef] [Google Scholar]
  • Y. Yin, Y. Wang, T.C.E. Cheng, W. Liu and J. Li, Parallel-machine scheduling of deteriorating jobs with potential machine disruptions. Omega 69 (2017) 17–28. [CrossRef] [Google Scholar]
  • X. Zhang, S.C. Liu, W.C. Lin and C.C. Wu, Parallel-machine scheduling with linear deteriorating jobs and preventive maintenance activities under a potential machine disruption. Comput. Ind. Eng. 145 (2020) 106482. [CrossRef] [Google Scholar]
  • S. Liu, J. Pei, H. Cheng, X. Liu and P.M. Pardalos, Two-stage hybrid flow shop scheduling on parallel batching machines considering a job-dependent deteriorating effect and non-identical job sizes. Appl. Soft Comput. 84 (2019) 105701. [CrossRef] [Google Scholar]
  • J. Pei, X. Liu, W. Fan, P.M. Pardalos and S. Lu, A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers. Omega 82 (2019) 55–69. [CrossRef] [Google Scholar]
  • K. Li, J. Chen, H. Fu, Z. Jia and J. Wu, Parallel machine scheduling with position-based deterioration and learning effects in an uncertain manufacturing system. Comput. Ind. Eng. 149 (2020) 106858. [CrossRef] [Google Scholar]
  • J. Ding, L. Shen, Z. Lü and B. Peng, Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration. Comput. Oper. Res. 103 (2019) 35–45. [CrossRef] [MathSciNet] [Google Scholar]
  • S. Dauzère-Pérès and L. Mönch, Scheduling jobs on a single batch processing machine with incompatible job families and weighted number of tardy jobs objective. Comput. Oper. Res. 40 (2013) 1224–1233. [Google Scholar]
  • S.S. Li and R.X. Chen, Single-machine parallel-batching scheduling with family jobs to minimize weighted number of tardy jobs. Comput. Ind. Eng. 73 (2014) 5–10. [CrossRef] [Google Scholar]
  • Z. Geng and J. Yuan, Pareto optimization scheduling of family jobs on a p-batch machine to minimize makespan and maximum lateness. Theor. Comput. Sci. 570 (2015) 22–29. [CrossRef] [Google Scholar]
  • B. Cheng, J. Cai, S. Yang and X. Hu, Algorithms for scheduling incompatible job families on single batching machine with limited capacity. Comput. Ind. Eng. 75 (2014) 116–120. [CrossRef] [Google Scholar]
  • L. Sun, A.J. Yu and B. Wu, Single machine common flow allowance group scheduling with learning effect and resource allocation. Comput. Ind. Eng. 139 (2020) 106126. [CrossRef] [Google Scholar]
  • A. Kramer, M. Iori and P. Lacomme, Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization. Eur. J. Oper. Res. 289 (2021) 825–840. [CrossRef] [Google Scholar]
  • X. Li, Y. Li and Y. Huang, Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families. Comput. Oper. Res. 106 (2019) 91–101. [CrossRef] [MathSciNet] [Google Scholar]
  • N. Alizadeh and A.H. Kashan, Enhanced grouping league championship and optics inspired optimization algorithms for scheduling a batch processing machine with job conflicts and non-identical job sizes. Appl. soft Comput. 83 (2019) 105657. [CrossRef] [Google Scholar]
  • E. Molaee, R. Sadeghian and P. Fattahi, Minimizing maximum tardiness on a single machine with family setup times and machine disruption. Comput. Oper. Res. 129 (2021) 105231. [CrossRef] [Google Scholar]
  • L. Mönch and S. Roob, A matheuristic framework for batch machine scheduling problems with incompatible job families and regular sum objective. Appl. Soft Comput. 68 (2018) 835–846. [CrossRef] [Google Scholar]
  • V. Abu-Marrul, R. Martinelli, S. Hamacher and I. Gribkovskaia, Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry. Comput. Oper. Res. 128 (2021) 105162. [CrossRef] [Google Scholar]
  • C.C. Wu and W.C. Lee, Single-machine group-scheduling problems with deteriorating setup times and job-processing times. Int. J. Prod. Econ. 115 (2008) 128–133. [CrossRef] [Google Scholar]
  • W.C. Lee and Z.S. Lu, Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs. Appl. Math. Comput. 218 (2012) 8750–8757. [MathSciNet] [Google Scholar]
  • Y.T. Xu, Y. Zhang and X. Huang, Single-machine ready times scheduling with group technology and proportional linear deterioration. Appl. Math. Model. 38 (2014) 384–391. [CrossRef] [MathSciNet] [Google Scholar]
  • X. Zhang, L. Liao, W. Zhang, T.C.E. Cheng, Y. Tan and M. Ji, Single-machine group scheduling with new models of position-dependent processing times. Comput. Ind. Eng. 117 (2018) 1–5. [CrossRef] [Google Scholar]
  • P.J. Lai and W.C. Lee, Single-machine scheduling with general sum-of-processing-time-based and position-based learning effects. Omega 39 (2011) 467–471. [CrossRef] [Google Scholar]
  • G. Dósa, R. Li, X. Han and Z. Tuza, Tight absolute bound for first fit decreasing bin-packing: FFD ≤ (L)11/9OPT(L) + 6/9. Theo. Comput. Sci. 510 (2013) 13–61. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.