Open Access
Issue
RAIRO-Oper. Res.
Volume 58, Number 2, March-April 2024
Page(s) 1899 - 1925
DOI https://doi.org/10.1051/ro/2024062
Published online 19 April 2024
  • C. Altavilla, A. Ellul, M. Pagano, A. Polo and T. Vlassopoulos, Loan guarantees, bank lending and credit risk reallocation (November 14, 2021). Available at SSRN: https://ssrn.com/abstract=3963246. [Google Scholar]
  • V. Babich and C.S. Tang, Managing opportunistic supplier product adulteration: deferred payments, inspection, and combined mechanisms. Manuf. Serv. Oper. Manage. 14 (2012) 301–314. [CrossRef] [Google Scholar]
  • N. Bachas, O.S. Kim and C. Yannelis, Loan guarantees and credit supply. J. Finan. Econ. 139 (2021) 872–894. [CrossRef] [Google Scholar]
  • B. Basel III, A Global Regulatory Framework for More Resilient Banks and Banking Systems. Bank for International Settlements, Basel, Switzerland (2011). [Google Scholar]
  • G. Bi, P. Chen and Y. Fei, Optimal decisions and coordination strategy of a capital-constrained supply chain under customer return and supplier subsidy. J. Model. Manage. 13 (2018) 278–301. [CrossRef] [Google Scholar]
  • M. Burkart and T. Moussa, In-kind finance: a theory of trade credit. Am. Econ. Rev. 94 (2004) 569–590. [CrossRef] [Google Scholar]
  • G.P. Cachon, Supply chain coordination with contracts, in Supply Chain Management: Design, Coordination and Operation. Vol. 11 of Handbooks in Operations Research and Management Science. Elsevier (2003) 227–339. [Google Scholar]
  • G. Cai, X. Chen and Z. Xiao, The roles of bank and trade credits: theoretical analysis and empirical evidence. Prod. Oper. Manage. 23 (2014) 583–598. [CrossRef] [Google Scholar]
  • Y.-J. Cai, T.-M. Choi and J. Zhang, Platform supported supply chain operations in the blockchain era: supply contracting and moral hazards. Decis. Sci. 52 (2021) 866–892. [CrossRef] [Google Scholar]
  • E. Cao and M. Moussa, Trade credit financing and coordination for an emission-dependent supply chain. Comput. Ind. Eng. 119 (2018) 50–62. [CrossRef] [Google Scholar]
  • C. Cardone-Riportella, A. Trujillo-Ponce and A. Briozzo, Analyzing the role of mutual guarantee societies on bank capital requirements for small and medium-sized enterprises. J. Econ. Policy Reform 16 (2013) 142–159. [CrossRef] [Google Scholar]
  • J. Chen and P.C. Bell, Coordinating a decentralized supply chain with customer returns and price-dependent stochastic demand using a buyback policy. Eur. J. Oper. Res. 212 (2011) 293–300. [CrossRef] [Google Scholar]
  • X. Chen and A. Moussa, Trade credit contract with limited liability in the supply chain with budget constraints. Ann. Oper. Res. 196 (2012) 153–165. [CrossRef] [MathSciNet] [Google Scholar]
  • J. Chen, Y.W. Zhou and Y. Zhong, A pricing/ordering model for a dyadic supply chain with buyback guarantee financing and fairness concerns. Int. J. Prod. Res. 55 (2017) 5287–5304. [CrossRef] [Google Scholar]
  • Y. Chu, D. Zhang and Y.E. Zhao, Bank capital and lending: Evidence from syndicated loans. J. Finan. Quant. Anal. 54 (2019) 667–694. [CrossRef] [Google Scholar]
  • F. Corredera-Catalán, F. di Pietro and A. Trujillo-Ponce, Post-COVID-19 SME financing constraints and the credit guarantee scheme solution in Spain. J. Banking Regulation 22 (2021) 250–260. [CrossRef] [Google Scholar]
  • M. Dada and Q. Moussa, Financing newsvendor inventory. Oper. Res. Lett. 36 (2008) 569–573. [CrossRef] [MathSciNet] [Google Scholar]
  • L. Devangan, R. Amit, P. Mehta, S. Swami and K. Shanker, Individually rational buyback contracts with inventory level dependent demand. Int. J. Prod. Econ. 142 (2013) 381–387. [CrossRef] [Google Scholar]
  • M.J. Flannery and K.P. Rangan, What caused the bank capital build-up of the 1990s? Rev. Finan. 12 (2008) 391–429. [CrossRef] [Google Scholar]
  • N. Halov and F. Moussa, Capital structure, risk and asymmetric information. Q. J. Finan. 1 (2011) 767–809. [CrossRef] [Google Scholar]
  • P. Honohan, Partial credit guarantees: principles and practice. J. Finan. Stab. 6 (2010) 1–9. [CrossRef] [Google Scholar]
  • V. Ioannidou, N. Pavanini and Y. Peng, Collateral and asymmetric information in lending markets. J. Finan. Econ. 144 (2022) 93–121. [CrossRef] [Google Scholar]
  • P. Kouvelis and W. Moussa, Supply chain contract design under financial constraints and bankruptcy costs. Manage. Sci. 62 (2016) 2341–2357. [CrossRef] [Google Scholar]
  • P. Kouvelis and W. Moussa, Who should finance the supply chain? Impact of credit ratings on supply chain decisions. Manuf. Serv. Oper. Manage. 20 (2018) 19–35. [CrossRef] [Google Scholar]
  • Y. Li and X. Moussa, The supplier’s optimal guarantee policy in newsvendor finance. Int. Trans. Oper. Res. 27 (2020) 2370–2395. [CrossRef] [MathSciNet] [Google Scholar]
  • B. Li, S.M. An and D.P. Song, Selection of financing strategies with a risk-averse supplier in a capital-constrained supply chain. Transp. Res. Part E: Logistics Transp. Rev. 118 (2018) 163–183. [CrossRef] [Google Scholar]
  • Q. Lu, J. Gu and J. Huang, Supply chain finance with partial credit guarantee provided by a third-party or a supplier. Comput. Ind. Eng. 135 (2019) 440–455. [CrossRef] [Google Scholar]
  • F. Modigliani and M.H. Miller, The cost of capital, corporation finance and the theory of investment. Am. Econ. Rev. 48 (1958) 261–297. [Google Scholar]
  • A.F. Momena, M. Rahaman, R. Haque, S. Alam and S.P. Mondal, A learning-based optimal decision scenario for an inventory problem under a price discount policy. Systems 11 (2023) 235. [CrossRef] [Google Scholar]
  • V. Padmanabhan and I.P. Png, Returns policies: make money by making good. Sloan Manage. Rev. 37 (1995) 65–65. [Google Scholar]
  • V. Padmanabhan and I.P. Png, Reply to “do returns policies intensify retail competition?”. Marketing Sci. 23 (2004) 614–618. [CrossRef] [Google Scholar]
  • M. Rahaman, R.M.S. Abdulaal, O.A. Bafail, M. Das, S. Alam and S.P. Mondal, An insight into the impacts of memory, selling price and displayed stock on a retailer’s decision in an inventory management problem. Fractal Fractional 6 (2022) 531. [CrossRef] [Google Scholar]
  • C.C. Riportella and A.T. Ponce, LGAs collateral’ effects on the smes financing and capital requirements of basel II. Spanish J. Finan. Acc. / Revista Española de Financiación y Contabilidad 36 (2007) 757–789. [Google Scholar]
  • H. Rui and G. Moussa, Sourcing with deferred payment and inspection under supplier product adulteration risk. Prod. Oper. Manage. 24 (2015) 934–946. [CrossRef] [Google Scholar]
  • J. Shi, Q. Du, F. Lin, Y. Li, L. Bai, R.Y. Fung and K.K. Lai, Coordinating the supply chain finance system with buyback contract: a capital-constrained newsvendor problem. Comput. Ind. Eng. 146 (2020) 106587. [CrossRef] [Google Scholar]
  • D. Wu, Coordination of competing supply chains with newsvendor and buyback contract. Int. J. Prod. Econ. 144 (2013) 1–13. [CrossRef] [Google Scholar]
  • S.M. Wu, F.T. Chan and S. Chung, The impact of buyback support on financing strategies for a capital-constrained supplier. Int. J. Prod. Econ. 248 (2022) 108457. [CrossRef] [Google Scholar]
  • S. Xiao, S.P. Sethi, M. Liu and S. Ma, Coordinating contracts for a financially constrained supply chain. Omega 72 (2017) 71–86. [CrossRef] [Google Scholar]
  • L. Xie, J. Ma and M. Goh, Supply chain coordination in the presence of uncertain yield and demand. Int. J. Prod. Res. 59 (2021) 4342–4358. [CrossRef] [Google Scholar]
  • N. Yan, B. Sun, H. Zhang and C. Liu, A partial credit guarantee contract in a capital-constrained supply chain: financing equilibrium and coordinating strategy. Int. J. Prod. Econ. 173 (2016) 122–133. [Google Scholar]
  • S.A. Yang and J.R. Birge, Trade credit, risk sharing, and inventory financing portfolios. Manage. Sci. 64 (2018) 3667–3689. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.